Installation and testing

Installation and testing

After the testing, the production has an edge over.

Our productive choices enable us to follow each single phase of the plant realization. In this way we could guarantee the efficiency and the compliance of the products to the elevated requested standards. Before the supply, each plant is severely tested, to assess not only the absence of manufacturing defects, but overall its compliance to the most severe specifications related to construction and production efficiency standards.

The installation, by the customer’s factory, is made by the same specialists which assembly and test the plant during the production phase: so the assembly time, and the consequent inconveniences that this work implies to the customer, are minimized.

Once installed, the plant is submitted also to the final test, to verify that its technical characteristics and performances are in accordance to the contractual obligations taken with the customer.

Open House Simat 2014

Summer 2014: Simat organizes an Open House to present the bending machine Levitate.

(more…)

 

2010 © SIMAT S.r.l. - Industrial area via Enore Tosi, 1 - 33034 Fagagna (UD) - Italy

info@simatautomation.com - phone +39 0432 958839 | +39 328 3476586 - VAT IT02550140301 - All rights reserved